AGP Picks
View all

Global Uranium Details ANT Survey Metrics at the Astro Project

News originally published by

GlobeNewswire

Passive seismic program at AS-1 target complete; results to guide planned winter ground EM program

CALGARY, Alberta, Nov. 19, 2026 (GLOBE NEWSWIRE) -- Global Uranium Corp. (CSE: GURN | OTC: GURFF | FRA: Q3J) (the "Company") is pleased to provide survey design and fieldwork metrics for the summer 2026 ambient noise tomography (“ANT”) program at the Astro Project (“Astro” or the “Project”) in the eastern Athabasca Basin, Saskatchewan. This update follows the Company’s October 8, 2026 announcement of fieldwork completion and provides further detail on the acquisition program supporting ongoing processing and interpretation. CAUR Technologies (“CAUR”) carried out the survey with field support from Axiom, under the direction of Project operator Cosa Resources Corp. (“Cosa”). Deployment began on June 17, 2026, and CAUR reported completion of the deployment campaign and crew demobilization by June 23, 2026.

The survey was designed around a planned deployment of 300 geophones, comprising 100 single-component and 200 three-component sensors. Eight field personnel worked in four two-person teams during deployment. CAUR reported deployment productivity of approximately 60 sensors per day in its campaign recap. The program included 21 days of seismic monitoring, which had been completed by July 12, 2026. It was confirmed on August 4, 2026 that sensor retrieval was complete. The survey focused on AS-1, a target area within the approximately 25-kilometre-long conductive corridor identified by the 2025 airborne Z-Axis Tipper Electromagnetic (“ZTEM”) survey. ANT uses recordings of ambient seismic noise to model subsurface shear-wave velocity. Variations in velocity can help interpret rock units, structures and possible alteration within the lower Athabasca sandstone and upper basement.

CAUR has prepared a preliminary report, with further processing and interpretation continuing. Global and Cosa intend to assess the ANT models alongside the ZTEM dataset to prioritize proposed ground electromagnetic (“EM”) surveying during the upcoming winter field season. Ground EM would provide more detailed definition of conductive targets ahead of potential drilling. The scope and timing of follow-up work remain subject to completed interpretation, funding, contractor availability and required approvals. Global expects to report interpretation results following technical review. Geophysical anomalies do not, on their own, establish the presence of uranium mineralization.

“This summer’s program went smoothly from deployment through retrieval, and we’re grateful to CAUR, Axiom and the Cosa team for running it so efficiently,” said Ungad Chadda, CEO of Global Uranium. “ANT gives us a new way to look beneath the surface at Astro without disturbing the ground. Combined with last year’s ZTEM results, it should help us decide where to focus our next round of fieldwork. We look forward to sharing the interpretation results once the technical review is complete.”

Astro Project boundary and approximate AS-1 target area, the focus of the 2026 ambient noise tomography (ANT) survey. The highlighted area is based on the survey plan and does not depict the final geophone deployment footprint or interpreted ANT results.

Figure 1. Astro Project boundary and approximate AS-1 target area, the focus of the 2026 ambient noise tomography (ANT) survey. The highlighted area is based on the survey plan and does not depict the final geophone deployment footprint or interpreted ANT results.

QUALIFIED PERSON

The scientific and technical information contained in this news release has been reviewed and approved by Jared Suchan, Ph.D., P.Geo., a Qualified Person as defined by NI 43-101".

For a discussion of the Company’s QA/QC and data verification processes and procedures, please see its most recently-filed technical report, a copy of which may be obtained under the Company’s profile at www.sedarplus.ca.

ABOUT GLOBAL URANIUM CORP.

Global Uranium Corp. focuses on exploring and developing uranium assets primarily in North America. The Company currently holds key uranium projects: the Wing Lake Project in the Mudjatik Domain of northern Saskatchewan, Canada; the Astro Project (with Cosa Resources Corp.) in the eastern Athabasca Basin, Saskatchewan; the Airline Project in the northern Wind River Basin, Wyoming, USA; as well as additional projects across the Gas Hills and Great Divide Districts in Wyoming.

ON BEHALF OF THE BOARD OF DIRECTORS

Ungad Chadda
CEO

587-330-0045
info@globaluranium.com 

FORWARD-LOOKING STATEMENTS

Certain statements contained in this press release constitute forward-looking information within the meaning of applicable securities laws. Forward-looking information relates to future events or future performance and is often, but not always, identified by words or phrases such as “could”, “intend”, “expect”, “believe”, “will”, “planned”, “proposed”, “potential”, “may”, “subject to” and similar expressions, or statements that certain actions, events or results will, may or could occur or be achieved. 

In particular, this press release contains forward-looking information concerning: the ongoing processing, interpretation and technical review of the ANT survey data; the assessment and integration of the ANT models with the ZTEM dataset; the use of those results to prioritize proposed ground EM surveying; the timing, scope and completion of the proposed winter field program; the ability of ground EM surveying to provide more detailed definition of conductive targets; the potential for subsequent drilling; and the timing of reporting interpretation results. Forward-looking information is based on management’s current expectations and assumptions, including that the ANT data can be processed and interpreted as anticipated; that the ANT and ZTEM datasets will assist in identifying and prioritizing targets; that sufficient funding, personnel, contractors, equipment and approvals will be available when required; that the Company and Cosa will continue to cooperate in respect of the Project; and that exploration activities will proceed substantially as currently contemplated. 

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those expressed or implied. These factors include: delays or difficulties in processing, interpreting or integrating geophysical data; the possibility that the survey results do not identify targets warranting further work; the inherent uncertainty of mineral exploration and the risk that geophysical anomalies do not represent uranium mineralization; changes to exploration plans, budgets or priorities; the availability and cost of financing, contractors, personnel and equipment; weather, access and operational risks; the ability to obtain required permits and approvals; title, environmental, regulatory and other risks; and the possibility that the Company and Cosa may not agree on, fund or complete proposed exploration activities on the anticipated timeline or at all. Although the Company believes that the assumptions and expectations reflected in the forward-looking information are reasonable, there can be no assurance that they will prove to be correct. Readers should not place undue reliance on forward-looking information. The forward-looking information in this release is made as of the date hereof, and the Company undertakes no obligation to update or revise it except as required by applicable securities laws. 

The Canadian Securities Exchange has not reviewed, approved, or disapproved the contents of this ‎press release.‎

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/76d9b6cf-aea1-4b3b-8f2a-2df2ac4e1911


Primary Logo

Figure 1

Astro Project boundary and approximate AS-1 target area, the focus of the 2026 ambient noise tomography (ANT) survey. The highlighted area is based on the survey plan and does not depict the final geophone deployment footprint or interpreted ANT results.

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

The Green Earth Gazette

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.